Planning to build an Accessory Dwelling Unit (ADU)? Here's a quick guide to get you started:
- Set clear goals for your ADU
- Assess your property's suitability
- Plan your finances and budget
- Design your ADU
- Select a qualified builder
- Obtain necessary permits
- Create a construction schedule
Quick facts:
- ADUs typically range from 600 to 1,200 square feet
- Average costs: $32,000 to $300,000+ depending on type
- Permit approval can take 1 to 6 months
- Construction timeline: 7 to 18 months on average
Key considerations:
- Check local zoning laws and building codes
- Factor in 10-15% extra for unexpected costs
- Choose contractors with ADU-specific experience
- Design for future needs and accessibility
By following these steps and keeping these points in mind, you'll be well-prepared to tackle your ADU project. Remember, thorough planning is crucial for a successful build.
Related video from YouTube
What is an ADU?
An Accessory Dwelling Unit (ADU) is a secondary living space on the same property as a main house. It's like having a mini-home in your backyard or attached to your house.
ADUs are self-contained living spaces. They have their own kitchen, bathroom, and living area. But here's the key: they're always smaller than the main house and on the same lot.
The Los Angeles City Ordinance No. 186481 defines an ADU as:
"An attached or detached residential dwelling unit provides complete independent living facilities for one or more persons and is located on a lot with a proposed or existing primary residence."
ADUs usually range from 600 to 1,200 square feet. That's enough space for comfortable living without overshadowing the main house.
Types of ADUs
ADUs come in different flavors:
- Detached New Construction: A standalone structure in your backyard. Think of it as a tiny house behind your main house.
- Garage Conversion: Turn that old garage into a cozy living space.
- Basement Conversion: Transform your unused basement into an apartment.
- Attached ADU: An addition to your existing home, like an in-law suite.
Here's a quick look at these ADU types:
ADU Type | What It Is | Typical Size | Common Use |
---|---|---|---|
Detached New Construction | Backyard standalone | 500-1,200 sq ft | Rental or guest house |
Garage Conversion | Transformed garage | 220-500 sq ft | Home office or studio |
Basement Conversion | Basement turned apartment | ~760 sq ft | Long-term rental |
Attached ADU | Addition to main house | Varies | Family living space |
Why Build an ADU?
Adding an ADU to your property can be a game-changer. Here's why:
- Extra Cash: In hot rental markets like Portland, where apartments go for about $2,000 a month, an ADU can be a nice income boost.
- Property Value Boost: A well-designed ADU can make your home more valuable and attractive to future buyers.
- Flexible Living: Need space for aging parents or adult kids? Want a home office? An ADU can adapt to your changing needs.
- Affordable Housing: In tight housing markets, ADUs offer more budget-friendly rental options compared to regular apartments.
- Smart Use of Space: Got an old garage or unused basement? An ADU can turn that wasted space into something useful.
But remember, ADUs aren't all sunshine and rainbows. They come with their own set of challenges and considerations.
Maxable, an ADU consultation company, says:
"After consulting with 4000 homeowners about their ADUs, and seeing 300 of them completed so far, we've pretty much got ADUs down to a science!"
This shows that ADUs are becoming more popular, and there's a lot of expert knowledge out there to help homeowners navigate the process.
Step 1: Set Your Goals
Setting clear goals is key to a successful ADU project. It'll help you make smart choices throughout the process. Here's what to focus on:
Planned Use
Figure out how you'll use your ADU. This decision will shape everything else.
Common ADU uses include:
- Rental unit for extra income
- Housing for family members
- Home office
- Guest house
Each use has its own considerations. For a rental, you'll need to check local regulations. For family housing, think about privacy and accessibility.
Money Limits
Set a realistic budget. ADU costs can vary a lot based on size, location, and finishes.
Here's a tip: Add 10-20% to your initial budget for unexpected costs. Trust us, they always pop up.
Project Schedule
Map out your timeline. Here's a rough guide:
- Design: 1-2 months
- Permitting: 3-4 months
- Construction: 4-6 months
But remember, your timeline might be different. Local rules and contractor availability can change things.
Design Needs
Think about both looks and function. Consider:
- Size: How big can it be? Check local rules.
- Style: Match your main house or go for something different?
- Features: What do you NEED in your ADU?
Maxable, an ADU expert, says:
"After consulting with 4000 homeowners about their ADUs, and seeing 300 of them completed so far, we've pretty much got ADUs down to a science!"
This shows how important good planning is. Set clear goals, and you're off to a great start.
Step 2: Check Your Property
Before diving into your ADU project, you need to make sure your property can handle it. Here's what to look at:
Land Review
Take a walk around your property. What do you see?
- How much space do you have?
- What's already there?
- Any trees or slopes to work around?
Remember: Your ADU can be up to 900 square feet or half your main house size, whichever is smaller. So grab that measuring tape!
Zoning Rules
Local laws can make or break your ADU dreams. Check these out:
- Are ADUs even allowed where you live?
- How big can they be?
- Where can you put them?
- What about parking?
Take San Mateo County, for example. They've got specific ADU rules for both non-coastal and coastal areas. You'll find them in Chapters 22.5 and 22.5.1 of their ADU Regulations.
"After consulting with 4000 homeowners about their ADUs, and seeing 300 of them completed so far, we've pretty much got ADUs down to a science!" - Maxable
Distance Rules
Setbacks are a big deal. Here's a quick look at typical requirements:
Location | Typical Setback |
---|---|
Side and rear property lines | 4 feet |
Corner lot (street side) | 15 feet |
From main house | 5 feet |
Front of property | 4 feet (as of 2023) |
But don't take our word for it. Always check your local rules!
Utility Access
Your ADU needs the basics:
- Water
- Electricity
- Sewer or septic
No easy access? Your wallet might feel the pinch.
Site Conditions
Last but not least, look at your actual site:
- Is it flat? Sloped?
- Where does water go when it rains?
- How's the sunlight?
Pro tip: Try tools like Symbium.com for an ADU report on your property. It'll show you what's possible.
sbb-itb-4e754d1
Step 3: Plan Your Money
Building an ADU isn't cheap. Let's break down the costs and funding options.
Price Planning
ADU costs vary based on type. Here's a quick overview:
ADU Type | Cost per Sq Ft | Total Cost |
---|---|---|
Prefab modular | $80 – $160 | $32,000 – $192,000 |
Attached | $125 – $225 | $50,000 – $270,000 |
Detached | $150 – $250 | $60,000 – $300,000 |
Above garage | $200 – $500+ | $80,000 – $600,000+ |
Basement conversion | $50 – $100+ | $20,000 – $120,000+ |
Garage conversion | $50 – $200 | $20,000 – $240,000 |
Keep in mind: These are averages. Your actual costs might be different.
Money Sources
How can you pay for your ADU? Here are some options:
- Home Equity Loans/HELOCs: 56% of California ADU builders use these.
- Cash-Out Refinancing: You'll need about $200,000 in home equity.
- Renovation Loans: RenoFi offers loans up to 90% of future home value.
- Unsecured Personal Loans: LightStream provides $5,000 to $100,000 loans.
Justin Goldman, Co-Founder and CEO of RenoFi, puts it bluntly:
"Simply put, recent homebuyers are stuck between a rock and a hard place as it can take a decade or more to build up the equity needed to tackle their renovation wishlist."
Cost Breakdown
Where does all that money go? Here's a typical breakdown:
Cost Category | Price Range |
---|---|
Design and Planning | $6,000 – $14,000 |
City Fees | $3,000 – $11,000 |
Construction Labor and Materials | $175 – $350 per sq ft |
Finish Materials | $50 – $100 per sq ft |
Labor is a big chunk - usually 40% to 60% of your total costs.
Extra Funds
Always plan for surprises. Set aside 10-15% of your budget for unexpected costs. For a $150,000 ADU, that's an extra $15,000 to $22,500.
Building an ADU isn't cheap, but with careful planning and the right financing, it can be a smart investment.
Step 4: Plan Your Design
Designing your ADU is where the rubber meets the road. Let's dive into the key elements:
Room Layout
Think flow when planning your ADU's layout. Open floor plans can make smaller spaces feel bigger and brighter. And don't forget about multi-functional areas - they're a game-changer in tight spaces.
Take this real-world example: A San Diego homeowner built an ADU for her 95-year-old mother-in-law. Their focus? An open layout with wide doorways for easy mobility.
Building Style
Your ADU should look like it belongs with your main house. Match or complement the exterior materials, and carry over key design elements.
Here's a quick guide:
Main House Style | ADU Design Approach |
---|---|
Craftsman | Wood trim and earthy colors |
Modern | Clean lines and large windows |
Victorian | Decorative elements and gabled roofs |
Space Needs
Size matters - and it's often limited by local rules. In Boise, Idaho, ADUs can't exceed 900 square feet or the size of the main house (whichever is smaller). Nampa, Idaho caps them at 500 square feet.
When planning your space, you'll typically need a living area, kitchen, bedroom, and bathroom. Get creative with storage - built-in shelving and under-bed storage can be lifesavers.
Main House Match
Your ADU should look like it belongs. Use similar or complementary colors to the main house. Extend this to your landscaping too - use similar plants and hardscaping for a cohesive look.
Here's a fun fact: The National Association of Realtors says homes with ADUs are priced 35% higher on average than those without. Not too shabby!
"No one knows how best to design a desirable and accommodating ADU than the occupant themself!" - Maxable
This quote nails it. Whether you're building for family or future renters, getting their input can make all the difference.
Step 5: Pick Your Builder
Finding the right builder for your ADU is crucial. Here's how to do it:
Find Builders
Start with THE BEST ADU BUILDERS. It's a platform that connects you with ADU pros across the US. Just submit your project details and get matched.
Other options? Try GreatBuildz, Houzz, or BuildZoom. They offer contractor ratings and reviews to help you choose.
Check Skills
Look for builders with ADU-specific experience. Here's what matters:
Skill | Why It's Important |
---|---|
ADU regulation know-how | Keeps your project legal and on budget |
ADU project history | Shows they've done this before |
Local involvement | Indicates they're in it for the long haul |
Paul Dashevsky from GreatBuildz says it best:
"I had a lot of good experiences, and I had a lot of bad experiences."
Compare Prices
Get at least three bids. But don't just go for the cheapest option. David Lang, an LA builder, warns:
"Always get at least three bids, because in this industry... there's a lot of thievery."
When reviewing quotes, look for:
- Detailed cost breakdowns
- Construction phase timelines
- How they handle surprises
Past Work
Talk to previous clients. Ask about:
- How the builder communicates
- If they stuck to the timeline
- The quality of their work
- How they dealt with problems
If you can, check out some finished ADUs in person.
Legal Papers
Make sure your builder has the right paperwork:
Document | Why You Need It |
---|---|
Contractor's license | Check it with the Licensing Board |
Liability insurance | Covers potential claims |
Worker's comp | For on-site accidents |
Danny Shuster from Construction & Consulting Services nails it:
"You don't shop around for a price... You literally shop around for the right rep from the right company."
In California, any job over $500 needs a licensed contractor. Use the Licensing Board's search tool to check credentials.
Step 6: Get Permits
Getting permits for your ADU is a key step. Here's how to tackle it:
Building Rules
Cities have different ADU rules. You need to know about:
- Zoning laws: Where and how big you can build
- Building codes: Safety and quality standards
In San Diego, for instance, you can build ADUs up to 1,200 square feet on most residential lots. But always check your local rules!
Required Papers
Get these ready:
Document | Why You Need It |
---|---|
Permit application | To officially ask for approval |
Property ownership proof | To show you can build there |
Site plans | To show where the ADU will go |
Construction plans | To detail your ADU specs |
CalGreen checklist | To meet green building rules |
Pro tip: Put the CalGreen checklist in your plans. California requires it for new buildings.
Filing Steps
1. Talk to experts
Local ADU builders or architects know the process well.
2. Get your papers ready
Make sure everything's correct.
3. Submit your application
File it with the local building department.
4. Pay the fees
Expect to pay at least $1,500 for permits and checks.
"You might spend $10,000 before you even start building!" - ADU Expert
Wait Times
In California:
- Agencies must respond within 60 days
- First review: 10 business days to a month
- Total approval: 1 to 6 months
But here's some good news: San Jose offers same-day approval for pre-approved ADUs!
Step 7: Make a Schedule
A solid schedule is key for your ADU project. Here's how to break it down:
Building Steps
Here's what a typical ADU construction timeline looks like:
Phase | Duration | Key Tasks |
---|---|---|
Pre-construction | 1-4 weeks | Site prep, final permitting |
Foundation | 2-3 weeks | Excavation, footings, foundation walls |
Framing | 3-4 weeks | Wall and roof framing, rough plumbing/electrical |
Exterior | 2-3 weeks | Roofing, siding, windows, doors |
Interior | 4-6 weeks | Insulation, drywall, finishes |
Mechanical | 2-3 weeks | HVAC, plumbing, electrical systems |
Finishing | 3-4 weeks | Trim, painting, flooring, fixtures |
Keep in mind: This is just a guide. Your project might be different.
Critical Moments
Don't forget to mark these in your schedule:
- Permit approval
- Foundation pour
- Framing inspection
- Utility connections
- Final inspection
These often need sign-offs before you can move forward. Plan for them.
Expect the Unexpected
Delays happen. Here's how to deal:
1. Weather buffer
If you're starting in spring, add extra time. Rain might slow things down.
2. Order early
Some items, like windows and custom cabinets, can take a while to arrive. Order them ASAP.
3. Flexible inspections
When you schedule inspections, give yourself a few days of wiggle room.
Pro tip: Add a 2-3 week buffer to your overall timeline. You'll thank yourself later.
Timing is Everything
Coordinating different trades is crucial. Here's how:
1. Get the order right
Make sure electricians and plumbers finish their rough-ins before the drywall goes up.
2. Multitask when possible
While the exterior work is happening, start on interior tasks.
3. Keep everyone in the loop
Use a shared calendar or project management tool. It'll save you headaches later.
"The average ADU construction timeline is around 7 to 18 months, from signing an agreement to the final inspection." - Maxable
That's a big range, right? Your timeline depends on your project's complexity, local rules, and how efficient your contractor is.
Helpful Tools
Building an ADU isn't a walk in the park. But don't worry - we've got your back with some handy tools to keep you on track.
Project Checklist
First things first: you need a game plan. Here's a quick checklist to get you started:
- Check local zoning laws
- Assess your property
- Decide on ADU type and size
- Set your budget
- Hire an architect or designer
- Get those construction plans rolling
- Submit permit applications
- Pick your contractor
- Nail down the construction schedule
- Break ground and start building
Cost Sheet
Money talks, so let's keep it in check. Use a cost sheet like this:
Category | Estimated Cost | Actual Cost | Difference |
---|---|---|---|
Design fees | $ | $ | $ |
Permits | $ | $ | $ |
Site preparation | $ | $ | $ |
Foundation | $ | $ | $ |
Framing | $ | $ | $ |
Roofing | $ | $ | $ |
Electrical | $ | $ | $ |
Plumbing | $ | $ | $ |
HVAC | $ | $ | $ |
Finishes | $ | $ | $ |
Total | $ | $ | $ |
Pro tip: Stash away 10-15% extra for those "oops" moments. Trust us, they happen.
Builder Chart
Choosing a contractor? Compare apples to apples with this chart:
Criteria | Builder A | Builder B | Builder C |
---|---|---|---|
Years of experience | |||
ADU-specific projects | |||
License & insurance | |||
References | |||
Estimated timeline | |||
Cost estimate | |||
Communication style | |||
Warranty offered |
Schedule Form
Time is money, folks. Keep tabs on your timeline:
Phase | Start Date | End Date | Duration | Status |
---|---|---|---|---|
Design | ||||
Permitting | ||||
Site prep | ||||
Foundation | ||||
Framing | ||||
Rough-ins | ||||
Insulation | ||||
Drywall | ||||
Finishes | ||||
Final inspection |
Permit List
Permits: can't live with 'em, can't build without 'em. Keep track:
Permit Type | Required | Submitted | Approved |
---|---|---|---|
Building permit | ☐ | ☐ | ☐ |
Electrical permit | ☐ | ☐ | ☐ |
Plumbing permit | ☐ | ☐ | ☐ |
HVAC permit | ☐ | ☐ | ☐ |
Zoning approval | ☐ | ☐ | ☐ |
Site plan review | ☐ | ☐ | ☐ |
Want to go high-tech? Check out project management software like Buildertrend. It's like having a personal assistant for your ADU project - tracking budgets, storing docs, and keeping everyone in the loop.
And here's a nugget from Leila Banijamali, CEO of Symbium:
"Our primary focus is streamlining the regulatory aspects of residential construction."
Speaking of Symbium, their "Build" tool is pretty nifty. It helps you visualize your ADU on your property and checks if you're playing by the local rules. Pretty cool, right?
Wrap-up
Building an ADU isn't a walk in the park, but it can be a game-changer for your property. Let's break down the must-knows:
Do your homework Don't jump in blind. Check local laws first. Greg Popovich from Maxable puts it bluntly: "Change orders are the death of getting an economical ADU." Know what's allowed before you start.
Plan like a pro Take time to design and plan. Look at your property, set clear goals, and make a realistic budget. And here's a pro tip: add 10-15% extra for surprises.
Pick your team carefully Work with ADU experts. They know the rules and can save you from costly mistakes. One expert warns: "Not having a cost change clause could cost you dearly."
Think ahead Design for the future. Consider features that make your ADU accessible and adaptable. Your needs might change, and your ADU should be ready for it.
Budget smart ADUs can cost anywhere from $80,000 to $400,000. Don't forget extras like utility meters - electricity alone can set you back $2,000 to $5,000.
Navigate the red tape Permits and approvals can take 1 to 6 months. Factor this into your timeline.
Stay in the loop Even with pros on the job, keep an eye on things. Regular check-ins can catch issues early and keep your project on track.